Cement Removal of Suction Anchor Reuse
In December 2025, Pipetech delivered another successful Aqua Milling® campaign in Bergen, Norway, supporting CCB Subsea with the refurbishment of subsea suction anchors. Building on a proven working relationship established in 2021, this project focused on enabling the safe and efficient reuse of critical subsea infrastructure components.
Challenge
The subsea anchoring solution was developed to lower overall well construction costs, enhance operational safety, and streamline installation activities for both exploration and production wells. The system combines a suction anchor with an integrated conductor, enabling the structure to embed securely into the seabed and form a high‑capacity, stable foundation for subsea wells. Once installed, it serves as the primary structural base for the wellhead system, transferring BOP and platform loads directly into the seabed rather than through the wellhead which significantly improves fatigue performance and long‑term system integrity. When these anchors are retrieved to the CCB quayside base in Ågotnes, Bergen for refurbishment and reuse, the cement within the annulus forms a strong bond between the inner liner and the outer casing. This bond prevents the inner liner from being pulled free, creating a significant operational barrier during rebuilding. Traditionally, this would require cutting out the affected section and welding in a new outer casing - a time consuming, labour intensive and costly process.
For CCB Subsea, the challenge was clear: remove the cement efficiently and safely to allow the inner liner to be extracted without damaging the anchor structure, enabling full reuse of the anchor.
Pipetech mobilised to the CCB yard in Bergen and deployed its proven Aqua Milling® technology, combined with a customised nozzle design specifically developed to tackle stubborn, bonded materials such as stubborn set cement.
The process involved:
- Using only water, with no chemicals or additives.
- Deploying the Aqua Milling®system from the base of the anchor.
- Self-propelling vertical through the 12-metre annulus while simultaneously removing the cement.
- Cleaning back to a bare metal finish, restoring the inner a structure to full bore condition.
Aqua Milling’s® ability to remove naturally forming and bonded materials without causing structural damage made it the ideal solution. Pipetech’s track record of successfully completing similar subsea anchor projects, up to twice annually since 2021, was a key reason the client selected them again for this work.
Results
The project was completed successfully, with all cement removed from the annulus. This enabled the client to extract the inner liner without requiring any structural alterations to the anchor.
As a result:
- The subsea anchor was fully reusable.
- The client avoided extensive cutting, welding, and reforming work.
- Significant time and associated operational costs were saved.
- The integrity of the original structure was maintained.
The project was successfully completed on time, allowing the client to avoid costly downtime and return the anchor to service quickly. By removing the cement without the need for cutting or welding, the client reduced repair risk, extended asset life, and maintained efficiency across their anchor rotation programme.
With 12 anchors planned to be in operational circulation, Pipetech look to expect frequent future work, reinforcing the long-term partnership established since 2021.

Key Project Details
Client
CCB Subsea
Location
Ågotnes, Bergen
Date
December 2025
Product Line
Aqua Milling®